Asalamu Alaikum,This week’s updates: The upstairs hall is having the floor levels adjusted so that it is one smooth level as much as possible. The wudu area is waiting for the sisters’ section demolition. Then the work on the drainage system installation will resume.Some tiling should be happening soon!